I am Chris Roper, Director of Traffic Management Deisign Services Ltd and I have been involved in traffic management planning for over 18 years and my focus is on designing traffic management that is safe for the workforce, the travelling public and causes the least disruption.  I have provided solutions in many difficult situations and have a strong reputation for providing a solution that satisfies all parties.

I produced my first scale Traffic Management Plan back in 2004 and have continued to learn and produce the very best traffic management CAD plans since then.  In October 2019 I set up Traffic Management Design Services Ltd due to the poularity of the service I provide . Also 2019 saw me upgrading the lap top and the CAD and software and plans are now produced using Cone 11.  I am able to provide a quick turnaround, always delivering the traffic management plans within the agreed time scales.  All plans are prepared in accordance with Chapter 8 and Street Works Codes of Practice and I hold NHSS 12D M7 qualification.

Plans will be attuned to suit whatever information you require such as a timing sheet, a grid reference and a sign schedule.  Plans are produced on your own template with and do not include my logo on them. Traffic management cad drawings are delivered to you in PDF format normally within 24 Hours, this does depend on quantity required.

Should you have a project that you would like assistance with, site visits can be arranged, either prior to preparing TM CAD plans, or along with the local authority as required.

Professional Indemnity and Public Liability Insurance are held. 

If you require any further information please get in touch by either emailing chris.roper@trafficmanagementcadplans.com or calling 07917 202 023

Traffic Management Design Services Ltd


‚ÄčTemporary Traffic Management Plans,

FOR ROADWORKS, EVENTS AND FILMING

Tel: 01923 463 496

TM CAD plans on time every time.